Scarborough Leisure Centre

A first-class leisure facility for local people.

Cllr. Tom Fox | Mayor of the Borough of Scarborough

Completed
money
100%
Fair payment
ccs
43/50
Considerate Constructors Scheme
tools
74%
local spend within 20 miles

Providing a high quality, multi-use wet and dry leisure complex and new football stadium, on an unused brownfield site, creating a lasting legacy for sport in the region.

As part of the regeneration of a former industrial site in Scarborough, the aim of this project is to provide a high quality, multi-use wet and dry leisure complex including a new football stadium.

Located on a previously unused ‘brownfield’ site, the leisure centre has allowed the council to unlock the potential of the land, creating a new revenue stream without incurring additional costs.

Scarborough Leisure Village provides an eight lane 25-metre Olympic legacy swimming pool, allowing for competitive swimming events. The pool also provides accommodation for 250 spectators.

In addition to the provision of a a fitness centre, the project also delivered an all-weather, FA-graded football pitch and spectator stand, which is now home to the town’s football team, Scarborough Athletic.

During the construction phase, our team welcomed many stakeholders onsite, from the council, local schools, colleges and local charities.

Since opening, retention of leisure centre members has been high, with new members joining to take advantage of the new facilities. The first swimming galas and football matches have taken place and been deemed a success, due to the bright, modern facilities.

The new complex has successfully met the needs of the community and the centre’s tenants, leaving a positive, lasting legacy for sport, health and wellbeing in the region.

This is one of three projects delivered by Willmott Dixon that have transformed Weaponess park in the town and redeveloped derelict brownfield sites. The others being a new University Technical College and satellite campus for Coventry University, both of which were delivered through our National Major Works framework.

The site was constrained on three sides by high voltage cables, which provide power to the whole of Scarborough and Whitby. This presented a logistical and safety challenge before any construction work was undertaken, to mitigate risk of disruption or injury.

The wider project involved the engagement of multiple stakeholders including Sport England, the Football Association and local sports clubs such as a disabled swimming group.

Managing the disparate needs of the stakeholders and accommodating their requirements was one of the major challenges on the project.

Together, we have delivered a fit-for-purpose, high quality sporting and leisure facility which has met the needs of the client, the tenant and the local community.

By developing previous unused land, we have enabled the council to use their estate effectively to drive revenue, support the wider regeneration agenda and improve health and well-being for their residents.

Delivered by

Project statistics

Project value

£7 million

Sector

Leisure and Recreation

Fair payment

100%

Considerate Constructors Scheme

43/50

Local spend within 20 miles

74%

Local labour within 20 miles

45%

Project procured via

Scape Major Works - legacy framework

Waste diverted from landfill

99%

Project gallery

Learn more

About our National Construction framework

Major Works England and Northern Ireland, part of the National Construction framework is designed to deliver construction projects between £2m and £20m.

Read about our frameworks

Access our Frameworks

Request an Access Agreement

The Access Agreement allows you to use any of our current or future frameworks, it only needs to be signed once and it carries no cost.

Learn more

Back to top